Ford, BMW lead Solid Power’s $130M Series B round

A Solid Power manufacturing engineer holds two 20 ampere hour (Ah) all solid-state battery cells for the BMW Group and Ford Motor Company. The 20 ampere hour (Ah) all solid-state battery cells were produced on Solid Power’s Colorado-based pilot production line. Source: Solid Power. Solid state battery systems have long been considered the next breakthrough in […]

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.